Adrian Power Projects

Power Substation Rehabilitation

Kenya Power and Lighting Company PLC (Kenya Power) owns and operates most of the electricity transmission and distribution system in the country and sells electricity to over 8 million Kenyans. The Company’s vision is to be Kenya’s energy solutions provider of choice by providing quality and reliable service to power people for better lives and enable the country’s socio-economic development in a sustainable manner.

Company Name   Kenya Power and Lighting PLC
Type of Project  Construction-Substation Rehabilitation and related Civil works
Project Sector  Power & Energy
Capacity Kitusuri, 66/11KV Substation Nairobi. Kenya
Problem/Challenge  Emergency rehabilitation and related civil works at the 66/11KV Substation
Adrian’s Mandate   Design, Civil works, Electrical works & Commissioning of Solar Plant 

Our Scope

Construction Of Paved Access Road.
General Storm Water Drainage System Including Drain Well
Switchyard Ballasting With Size.
Supply And Installation Of Steel Structure For Water Tower Tank.
Rehabilitate All Existing Trenches And Raising To Prevent Flooding
Rehabilitation Of The Existing Control Room.
Provision Of Flood Mitigation Temporary Works During Construction Period
Supply And Installation Of Steel Structure For Water Tower Tank.
Making Good All Disturbed Areas And Reinstatement.